Pinolli Pine Nut Factory

2013 to 2014

As main the contractor we constructed the insulated panel building for the processing of pine nuts, along with the smaller buildings.

This included initial bulk site works, building the site up with hardfill to obtain a level building platform, followed by construction of the buildings, drainage and outside concrete aprons.